            高低壓成套設備安裝需要注意哪些事項?

            發布時間:2023-07-24 來源:http://m.landmann.cn/ 瀏覽量:

            1.安裝時,配電柜應按照施工圖的布置順序放置在基礎鋼筋上。單獨的機柜可調節機柜表面和側面的垂直度整個問題可以通過添加墊片來解決,但不超過三個墊片,并且焊接牢固。放置一排機柜中的每個單元后,調整PDC的水平度和面板偏差。應進行調整以滿足施工規范的要求。
            During installation, the distribution cabinet should be placed on the foundation steel bars in the order shown in the construction drawings. The verticality of the surface and sides of the individual cabinet can be adjusted. The entire problem can be solved by adding gaskets, but not more than three gaskets, and the welding is firm. After placing each unit in a row of cabinets, adjust the levelness and panel deviation of the PDC. Adjustments should be made to meet the requirements of construction specifications.
            2,安裝應嵌入盒子中,安裝面板應與墻壁齊平;壁掛式配電柜可以通過膨脹螺栓固定在墻上,但空心磚或燕尾螺栓應預埋在砌塊墻上或用方頭螺栓固定。調整PDC后,在PDC主體上安裝螺栓并擰緊鋼筋。
            2. The installation should be embedded in the box, and the installation panel should be flush with the wall; Wall mounted distribution cabinet can be fixed on the wall by expansion bolt, but Concrete masonry unit or dovetail bolt shall be embedded on the block wall or fixed by square head bolt. After adjusting the PDC, install bolts on the PDC body and tighten the steel bars.
            3.高低壓成套裝置接地注意事項如下:每個PDC都連接到基礎鋼上。銅電纜可用于將PDC中的PE排連接到接地螺栓。根據連接情況,必須添加彈簧墊圈以防止松動。每個柜門應使用銅編織線牢固地連接到PE排。
            濟南機箱機柜
            3. The grounding precautions for the high and low voltage complete equipment are as follows: each PDC is connected to the foundation steel. Copper cables can be used to connect the PE busbar in the PDC to the grounding bolt. According to the connection situation, spring washers must be added to prevent loosening. Each cabinet door should be securely connected to the PE busbar using copper braided wire.
            4.將配電柜頂部連接到母線上,并注意按要求擰緊母線配套扳手,接觸面應涂上中性凡士林。在配電柜之間連接母線時,注意母線是否離其他設備或外殼太近,并注意正確的相位。
            4. Connect the top of the power distribution cabinet to the bus, and pay attention to tightening the bus matching wrench as required. The contact surface should be coated with neutral Vaseline. When connecting busbars between distribution cabinets, pay attention to whether the busbars are too close to other equipment or enclosures, and pay attention to the correct phase.
            5.控制線校準后,將每條芯線形成一個圓圈,并用鍍鋅螺釘、吊環和彈簧墊將其連接到每個接線板上。通常,條帶的每側各有一根,每個端子有一根電線,再Z兩根電線,然后在兩根電線之間加一個吊環。多股電線應鍍錫,不得斷裂。
            After the control wire is calibrated, form a circle for each core wire and connect it to each terminal block using galvanized screws, lifting rings, and spring pads. Usually, there is one wire on each side of the strip, one wire at each terminal, and then two wires, and a lifting ring is added between the two wires. Multiple wires should be tinned and not broken.
            6、控制電路檢查:檢查電路是否因運輸等因素而松動,并擰緊,檢查電氣元件是否損壞。
            6. Control circuit inspection: Check whether the circuit is loose due to transportation and other factors, tighten it, and check whether the electrical components are damaged.
            首頁首頁 產品產品 電話電話 置頂置頂
            主站蜘蛛池模板: 午夜精品一区二区三区的区别 | 亚洲天堂免费一二三四区| 免费女人18毛片a毛片视频| 在线免费播放av日韩| 久久综合九色综合欧洲98| 久久亚洲精品无码网站| 国产高清一区二区三区视频| 内射无码专区久久亚洲| 久久久九九精品国产毛片a片 | 亚洲熟妇无码一区二区三区| 正在播放国产乱子伦最新视频| 精品人妻日韩中文字幕| 欧美性猛交xxxx免费看| 欧美极品少妇做受| 亚洲一二三区精品与老人| 精品人妻少妇一区二区三区在线| 成年午夜免费韩国做受视频| 视频一区二区 国产视频| 国产精品多人p群无码| 黄床片30分钟免费视频教程| 久久人体视频| 高清视频在线观看一区二区三区| 国产一国产aa毛片| 久久久喷潮一区二区三区| 欧美成人看片一区二区| 国产在线精品福利91香蕉| 日本MV高清在线成人高清| 免费视频成人片在线观看| 蜜桃网址| 国产成人精品无码短视频| 人妻无码专区一区二区三区| 久久精品A一国产成人免费网站| 日本做受高潮好舒服视频| 亚洲中久无码永久在线观看软件| 国产成人a在线观看视频免费| 亚洲综合另类小说色区色噜噜| 国产无遮挡免费真人视频在线观看| 国产午夜福利av在线麻豆| 亚洲综合无码一区二区| 尤物tv国产精品看片在线| 重口SM一区二区三区视频|