波多野结衣三级一区,国产日产高清欧美一区,91自拍视频97,国产福利不卡一区二区三区,中文字幕亚洲无线码在线视频,国产成人凹凸视频在线,最近手机中文字幕高清大全8,女人脱裤子被摸呻吟黄色视频
            您好,歡迎來到濟南通宇恒成自動化工程有限公司網站!

            服務熱線

            當前位置: 首頁- 新聞中心 > 業內資訊
            常見問題
            新聞中心

            高低壓成套設備安裝需要注意哪些事項?

            發布時間:2023-07-24 來源:http://m.landmann.cn/ 瀏覽量:

            1.安裝時,配電柜應按照施工圖的布置順序放置在基礎鋼筋上。單獨的機柜可調節機柜表面和側面的垂直度整個問題可以通過添加墊片來解決,但不超過三個墊片,并且焊接牢固。放置一排機柜中的每個單元后,調整PDC的水平度和面板偏差。應進行調整以滿足施工規范的要求。
            During installation, the distribution cabinet should be placed on the foundation steel bars in the order shown in the construction drawings. The verticality of the surface and sides of the individual cabinet can be adjusted. The entire problem can be solved by adding gaskets, but not more than three gaskets, and the welding is firm. After placing each unit in a row of cabinets, adjust the levelness and panel deviation of the PDC. Adjustments should be made to meet the requirements of construction specifications.
            2,安裝應嵌入盒子中,安裝面板應與墻壁齊平;壁掛式配電柜可以通過膨脹螺栓固定在墻上,但空心磚或燕尾螺栓應預埋在砌塊墻上或用方頭螺栓固定。調整PDC后,在PDC主體上安裝螺栓并擰緊鋼筋。
            2. The installation should be embedded in the box, and the installation panel should be flush with the wall; Wall mounted distribution cabinet can be fixed on the wall by expansion bolt, but Concrete masonry unit or dovetail bolt shall be embedded on the block wall or fixed by square head bolt. After adjusting the PDC, install bolts on the PDC body and tighten the steel bars.
            3.高低壓成套裝置接地注意事項如下:每個PDC都連接到基礎鋼上。銅電纜可用于將PDC中的PE排連接到接地螺栓。根據連接情況,必須添加彈簧墊圈以防止松動。每個柜門應使用銅編織線牢固地連接到PE排。
            濟南機箱機柜
            3. The grounding precautions for the high and low voltage complete equipment are as follows: each PDC is connected to the foundation steel. Copper cables can be used to connect the PE busbar in the PDC to the grounding bolt. According to the connection situation, spring washers must be added to prevent loosening. Each cabinet door should be securely connected to the PE busbar using copper braided wire.
            4.將配電柜頂部連接到母線上,并注意按要求擰緊母線配套扳手,接觸面應涂上中性凡士林。在配電柜之間連接母線時,注意母線是否離其他設備或外殼太近,并注意正確的相位。
            4. Connect the top of the power distribution cabinet to the bus, and pay attention to tightening the bus matching wrench as required. The contact surface should be coated with neutral Vaseline. When connecting busbars between distribution cabinets, pay attention to whether the busbars are too close to other equipment or enclosures, and pay attention to the correct phase.
            5.控制線校準后,將每條芯線形成一個圓圈,并用鍍鋅螺釘、吊環和彈簧墊將其連接到每個接線板上。通常,條帶的每側各有一根,每個端子有一根電線,再Z兩根電線,然后在兩根電線之間加一個吊環。多股電線應鍍錫,不得斷裂。
            After the control wire is calibrated, form a circle for each core wire and connect it to each terminal block using galvanized screws, lifting rings, and spring pads. Usually, there is one wire on each side of the strip, one wire at each terminal, and then two wires, and a lifting ring is added between the two wires. Multiple wires should be tinned and not broken.
            6、控制電路檢查:檢查電路是否因運輸等因素而松動,并擰緊,檢查電氣元件是否損壞。
            6. Control circuit inspection: Check whether the circuit is loose due to transportation and other factors, tighten it, and check whether the electrical components are damaged.
            首頁首頁 產品產品 電話電話 置頂置頂
            主站蜘蛛池模板: 精品国产亚洲午夜精品av| 97国产精品视频在线观看| 波多野结衣爽到高潮大喷| 性虎精品无码AV导航| 久久伊人蜜桃av一区二区 | 亚洲成av人片天堂网无码| 成年黄页网站大全免费无码| 18禁无遮挡啪啪无码网站破解版 | 午夜一区欧美二区高清三区| 在线日韩日本国产亚洲| 日本高清一区二区三| 香蕉噜噜噜噜私人影院| 91九色国产成人久久精品| 国产美女精品一区二区三区| 亚洲国产成人影院播放| 中文字日产幕码三区国产| 久久久国产一区二区三区| 国产成人av区一区二区三 | 日本一区二区三区免费播放| 亚洲日本高清一区二区三区| 亚洲人成人一区二区三区| 国产精品久久久久久人妻精品动漫| 2019久久视频这里有精品15| 国产三级精品三级在线区| 九色综合狠狠综合久久| 丰满人妻无码∧v区视频| 野外做受三级视频| 精品久久久久久中文字幕| 久久精品无码一区二区app | 最新国产成人无码久久| 日本高清www无色夜在线视频| 啦啦啦啦在线视频免费播放6| 亚洲国产成人久久综合区| 人成午夜大片免费视频77777| 手机看片日韩国产毛片| 无码aⅴ在线观看| 亚洲精品自产拍在线观看动漫| 久99久热免费视频播放| 久久久久人妻精品一区二区三区| 特级a欧美做爰片黑人| 亚洲色大成成人网站久久|